Research Article

Utilization of Animal Solid Waste for Electricity Generation in the Northwest of Iran 3E Analysis for One-Year Simulation

Table 3

Technical and economic information of the equipment used in the solar-diesel system [28, 29].

EquipmentCost ($)Size (kW)Other information
CapitalReplacementO & M

PV20002000100–600Lifetime: 20 years, derating factor: 80%
Generic 1 kWh lead acid12001100500–1200Nominal voltage: 2, nominal capacity: 1.03 kWh, lifetime throughput: 843 kWh
Biomass generator3002700.10–100Lifetime: 15000 hr, minimum load ratio: 25%
Converter30030000–100Lifetime: 15 years, efficiency: 95%
Generic 10 kW10,0008,0001,50010Lifetime: 20 years, hub height: 24 m