Research Article

Study on Numerical Simulation of Surrounding Rock Structure Safety of Urban Underwater Shield Tunnel: A Case in Chongqing

Figure 15

The displacement nephogram of lining segment installed at YCK22 + 773.00 cross-section (left tunnel). (a) Horizontal displacement after the left-line excavation is completed and (b) vertical displacement after the left-line excavation is completed.
(a)
(b)