Research Article
Prediction of Bench Blasting Vibration on Slope and Safety Threshold of Blasting Vibration Velocity to Undercrossing Tunnel
Table 8
PPVs of field monitoring and numerical simulation at monitoring points.
| Monitoring points | PPV of field monitoring (cm/s) | PPV of numerical simulation (cm/s) | Relative error of PPV (%) | x | y | z | x | y | z | x | y | z |
| 1# | 6.94 | 3.61 | 7.48 | 7.3 | 3.75 | 8.03 | 5.19 | 3.88 | 7.35 | 2# | 4.76 | 2.18 | 4.8 | 5.04 | 2.25 | 5.05 | 5.88 | 3.21 | 5.21 | 3# | 3.16 | 1.87 | 2.98 | 3.34 | 2.06 | 3.13 | 5.70 | 10.16 | 5.03 | 4# | 2.17 | 1.3 | 2.34 | 2.32 | 1.42 | 2.46 | 6.91 | 9.23 | 5.13 | 5# | 1.32 | 1.08 | 1.65 | 1.42 | 1.17 | 1.54 | 7.58 | 8.33 | -6.67 |
|
|