Research Article

Rail Corrugation Detection of High-Speed Railway Using Wheel Dynamic Responses

Table 1

Parameters for Chinese high-speed train CRH3 [13].

ParameterValueUnit

Mass of car body40000kg
Mass of bogie3200kg
Mass of wheelset2400kg
Pitch inertia of car body547000kg·m2
Pitch inertia of bogie6800kg·m2
Stiffness of primary suspension system2.08 × 106N/m
Stiffness of secondary suspension system8 × 105N/m
Damping of primary suspension system1 × 105N·s/m
Damping of secondary suspension system1.2 × 105N·s/m
Semilongitudinal distance between bogies8.6875m
Semilongitudinal distance between wheelsets in bogie1.25m
Radius of wheel0.46m