Research Article

Enhancing Resilience through Nuclear Emergency Preparedness at El Dabaa Site

Table 3

Sequences of events within accident scenarios.

Type of accidentLOCA S1LOCA S2LTSBO S3

ShutdownMm 06 : 00 (month is depending on seasons timing)
Simulation period96 hours
Release start (core uncovered)After 25 secondAfter 25 secondAfter 8 hr in rascal (default value)
Core statusRecovered after 3735 secondVessel meltdownCore recovered in rascal after 3 hr