Research Article
Enhancing Resilience through Nuclear Emergency Preparedness at El Dabaa Site
Table 3
Sequences of events within accident scenarios.
| Type of accident | LOCA S1 | LOCA S2 | LTSBO S3 |
| Shutdown | Mm 06 : 00 (month is depending on seasons timing) | Simulation period | 96 hours | Release start (core uncovered) | After 25 second | After 25 second | After 8 hr in rascal (default value) | Core status | Recovered after 3735 second | Vessel meltdown | Core recovered in rascal after 3 hr |
|
|