Research Article

Evaluation of Worker Radiation Exposure during the Kori Unit 1 Steam Generator Dismantling Process

Table 4

Pipe connected to SG cutting time.

PipeCutting time (min)

Cold leg pipe (RCS)190 (remote) + 260
Hot leg pipe (RCS)200 (remote) + 263
Main steam pipe172
Main feedwater pipe75
Drain pipe (1)35
Drain pipe (2)27
Intake and outlet pipe35
Wet well vent pipe35
Level/flow measurement pipe23
Sample collection pipe23

RCS: reactor coolant system.