Research Article

Core Design of a Small Pressurized Water Reactor with AP1000 Fuel Assembly Using SRAC and COBRA-EN Codes

Figure 1

Locations of fuel rods, guide thimbles (GT), and instrumentation thimble (IT) in a fuel assembly.