Improving Quality, Productivity, and Cost Aspects of a Sewing Line of Apparel Industry Using TQM Approach

Table 8

OEE calculation.

FactorCategoryBefore TQMAfter TQMFactorCategoryBefore TQMAfter TQM

AvailabilityManpower8176EfficiencyManpower8176
Working hour1010Working hour1010
Working minutes600600Working minutes600600
Machine quantity6865Available minutes48,60045,600
Loss time680600Production quantity2,1112,117
Operating time40,17038,370SAM12.5312.33
Available time40,80039,000Earned minutes26,45026,102
Availability %98.4698.38Efficiency %54.4357.24

PerformanceProduction quantity2,1112,117QualityTotal production25,43125,407
SAM12.5312.33Defect quantity1,9051,528
Earned minutes26,45026,102Good output23,52623,879
Operating minutes40,17038,370DHU %7.496.01
Performance %65.8568.03Quality %92.5193.99

QualityTotal production25,43125,407CostManpower8176
Defect quantity1,9051,528Working hour1010
Good output23,52623,879Working minutes48,60045,600
Quality %92.5193.99xy
OverallOEE %59.9762.90Production cost48,600x45,600y

CPM values depend on the total cost of the organization (x ≥ y).