Improving Quality, Productivity, and Cost Aspects of a Sewing Line of Apparel Industry Using TQM Approach

Table 6

Production summary and improvement analysis.

Production summary
CriteriaBefore TQMAfter TQMSavings/improvement

Actual average output (for 12 days)2,1112,1176
Working minutes per day6006000
Operator required68653
Helper required13112
Total manpower required81765
Total SAM12.5312.330.20
Line balance efficiency88%93%5%
Output per hour (Pcs)3203200
Total expected output (Pcs)3,2003,2000
Output per M/C per day (Pcs)47492