Research Article

Failure Analysis of Tubing Collapse in a Gas Well

Table 6

Collapse test results of the same batch of tubing without failure.

SampleExternal load (MPa)Result

The tubing without failure in the same batch94.5The tubing body was collapsed and failed
Requirements of ordering technical agreement requirement≥93.3