Research Article

Probabilistic Chronological Production Simulation-Based Coordinated Dispatching for Cascaded Hydro-PV-PSH Combined Power Generation System

Table 2

Parameters used in production simulation.

Power typeUnit capacity (MW)Unit forced outage rateGeneration price (¥/MWh)Shortage price (¥/MWh)Curtailment price (¥/MWh)

Cascade hydro10.089150185185

Power typeLongitude (°)Latitude (°)Generation price (¥/MWh)Shortage price (¥/MWh)Curtailment price (¥/MWh)

PV102.364430.99918125185205

Power typeUnit capacity (MW)Unit forced outage rateGeneration price (¥/MWh)Shortage price (¥/MWh)Pumping price (¥/MWh)

PSH0.50.08240310180