Research Article

Probabilistic Chronological Production Simulation-Based Coordinated Dispatching for Cascaded Hydro-PV-PSH Combined Power Generation System

Table 1

Parameters of each generator.

Bus IDPower typeInstalled capacity (MW)Reservoir capacity (104 m3)Water head (m)Working flow (m3/s)

1PV-150
2PV-250
7CH-520339.097.4
13CH-33637.29133
14
15CH-64.85310.548.9
16PSH525.6/23.7339.097.4
18CH-26020.912753.4
21CH-45425.616147.1
22CH-14516.1123.6543.32
23CH-78444.275