Probabilistic Chronological Production Simulation-Based Coordinated Dispatching for Cascaded Hydro-PV-PSH Combined Power Generation System
Table 1
Parameters of each generator.
| Bus ID | Power type | Installed capacity (MW) | Reservoir capacity (104 m3) | Water head (m) | Working flow (m3/s) |
| 1 | PV-1 | 50 | — | — | — | 2 | PV-2 | 50 | — | — | — | 7 | CH-5 | 20 | — | 339.09 | 7.4 | 13 | CH-3 | 36 | 37.2 | 91 | 33 | 14 | — | — | — | — | — | 15 | CH-6 | 4.8 | 53 | 10.5 | 48.9 | 16 | PSH | 5 | 25.6/23.7 | 339.09 | 7.4 | 18 | CH-2 | 60 | 20.9 | 127 | 53.4 | 21 | CH-4 | 54 | 25.6 | 161 | 47.1 | 22 | CH-1 | 45 | 16.1 | 123.65 | 43.32 | 23 | CH-7 | 84 | 44.2 | 75 | — |
|
|