Research Article
Multicriteria Evaluation of Transport Plan for High-Speed Rail: An Application to Beijing-Xiongan
Table 11
Limits of changing the weights of all the criteria while preserving the best solution.
| Criteria | Weight,% | Scenario 1 | Scenario 2 | Minimum weight, % | Maximum weight, % | Range difference, % | Minimum weight, % | Maximum weight, % | Range difference, % |
| C1 | 15 | 10.53 | 15.56 | 5.03 | 9.19 | 20.06 | 10.87 | C2 | 4 | 0.00 | 5.26 | 5.26 | 0.00 | 12.33 | 12.33 | C3 | 16 | 15.44 | 31.61 | 16.17 | 13.25 | 16.83 | 3.58 | C4 | 6 | 5.37 | 23.47 | 18.10 | 2.93 | 6.93 | 4.00 | C5 | 19 | 18.46 | 20.98 | 2.52 | 18.18 | 26.81 | 8.63 | C6 | 1 | 3.78 | 11.44 | 7.66 | 10.33 | 13.73 | 3.40 | C7 | 15 | 14.14 | 36.69 | 22.55 | 12.22 | 15.63 | 3.41 | C8 | 14 | 7.03 | 14.43 | 7.40 | 12.69 | 16.64 | 3.95 |
|
|