Research Article

Multicriteria Evaluation of Transport Plan for High-Speed Rail: An Application to Beijing-Xiongan

Table 11

Limits of changing the weights of all the criteria while preserving the best solution.

Criteria Weight,%Scenario 1Scenario 2
Minimum weight, %Maximum weight,
%
Range difference,
%
Minimum weight, %Maximum weight,
%
Range difference,
%

C11510.5315.565.039.1920.0610.87
C240.005.265.260.0012.3312.33
C31615.4431.6116.1713.2516.833.58
C465.3723.4718.102.936.934.00
C51918.4620.982.5218.1826.818.63
C613.7811.447.6610.3313.733.40
C71514.1436.6922.5512.2215.633.41
C8147.0314.437.4012.6916.643.95