Research Article
Multicriteria Evaluation of Transport Plan for High-Speed Rail: An Application to Beijing-Xiongan
Table 1
Pairwise comparison of criteria from C1 to C5 and weights.
| Criteria | C1 | C2 | C3 | C4 | C5 | Weights |
| C1: Travel time, min | 1 | 4 | 2 | 5 | 1 | 0.35 |
| C2: Number of train stops | 1/4 | 1 | 1/5 | 1/2 | 1/3 | 0.06 |
| C3: Transport satisfaction, pair trains/day | 1/2 | 5 | 1 | 4 | 2 | 0.30 |
| C4: Number of seats/day | 1/5 | 2 | 1/4 | 1 | 1/2 | 0.09 |
| C5: Connectivity | 1 | 3 | 1/2 | 2 | 1 | 0.20 |
| CR=0.09 | | | | | | |
|
|