Research Article
Automatic Surgery and Anesthesia Emergence Duration Prediction Using Artificial Neural Networks
Table 11
Running time cost of each architecture of the surgery duration prediction system.
| Architecture | Time (s) |
| 3-64 | 339.72 | 3-128 | 404.73 | 3-256 | 584.24 | 3-512 | 1806.50 | 4-64 | 375.72 | 4-128 | 474.83 | 4-256 | 756.63 | 4-512 | 2480.10 | 5-64 | 404.15 | 5-128 | 560.63 | 5-256 | 923.48 | 5-512 | 3325.30 | 6-64 | 448.18 | 6-128 | 622.16 | 6-256 | 1072.77 | 6-512 | 4155.28 |
|
|