Research Article
Numerical Simulation Study on the Development Effect of Gravity Fire Flooding by Vertical Well Sidetracking
Figure 8
Recovery sensitivity analysis results. Among them, the meanings of the abbreviated letters in the figure are as follows: Ps: perforation location of gas injection well; So: oil saturation; Perm: permeability;: reservoir thickness; Por: porosity;: gas injection rate.
(a) The sidetracking length of vertical well is 30 m |
(b) The sidetracking length of vertical well is 40 m |
(c) The sidetracking length of vertical well is 50 m |