No.AttemptMethodWeaknessYearReference

1Multicriteria decision making for PV power plant site selectionGIS-based AHP approachUsed less number of criteria for analysis2018[13]
2Multicriteria decision making for supplier selectionAHPIt was not georeferenced2019[14]
3Site assessment for plant cooling systemGIS-AHP combinationSensitivity analysis was not considered2018[15]
4.Multicriteria decision making for suitable site selection of solar PVAHPSensitivity analysis was not considered2018[16]
5.Project risk assessmentFuzzy-Delphi methodologyUsed less number of criteria for analysis and not georeferenced2018[17]
6.Multicriteria decision analysis and fuzzy for site selection problemsGIS-fuzzyThere was no specific case study area2019[18]
7.Multicriteria decision making for ranking renewable energy resourcesAHPIt was not georeferenced2018[19]
8.Multicriteria decision making for renewable energy potential assessmentAHPSensitivity analysis was not considered2019[20]
9.Multicriteria decision analysis for site selection problemsAHPThere was no specific case study area2019[21]
10.Multicriteria decision making for optimal location selection for offshore wind-PV-seawater pumped storage power plantAHPIt was not georeferenced2019[22]
11.Multicriteria decision analysis and fuzzy for optimizing location selection for biomass energy power plantsFuzzy-AHPIt was not georeferenced2019[23]
12.Multicriteria decision making for analysis of land availability for power plants and assessment of solar photovoltaic developmentAHPā€‰2019[24]