Research Article

Effect of Change in Plant Capacity towards Controllability of Biohydrogen Production Plant from Biomass

Table 9

ISE values for the dry biomass temperature change test for plant with capacity B.

Control systemsISE values
+50%+100%āˆ’50%āˆ’100%

Gasifier26.21104.5622.4075.50
Char combustor0.260.950.170.68
Flue gas cooler0.010.020.030.15
SMR12.38141.076.6345.17
Cooler before WGS reactor0.8532.463.301.37