Research Article

Effect of Change in Plant Capacity towards Controllability of Biohydrogen Production Plant from Biomass

Table 6

ISE values for the dry biomass molar flow rate change test for plant with capacity A.

Control systemsISE values
+5%+10%+20%+25%+30%āˆ’5%āˆ’10%

Gasifier13,25116,89921,47438,061-(Failed)17,80197,941
Char combustor3,2895,90322,735180,272-(Failed)3,734-(Failed)
Flue gas cooler1,1741,8066,912607,827-(Failed)1,173-(Failed)
SMR7,40511,48734,866104,564-(Failed)6,68020,011
Cooler before WGS reactor1,3842,2347,85544,963-(Failed)1,3663,721