The results and comparison among the scenarios for the IEEE 69-bus RSD.

ParameterScenarios
SequentiallySimultaneously
Base caseCOP after DSRDSR after OCPDSR and OCP

Tie switch number69, 70, 71, 72, and 7316, 21, 40, 45, and 5614, 42, 55, 62, and 7014, 18, 38, 57, and 63
Total power loss (kW)224.960695.219886.403985.4559
Capacitor location28, 60, 6615, 47, 6039, 61, 65
Capacitor size KVAR1200, 900, and 500500, 1000, and 1000700, 1100, and 500
(p.u.)0.909010.950.950.96632
(p.u.)1111
Execution time (sec.)1.772511390.255112383.00418857.2237
Convergence iterations49376
Percentage loss reduction57.672761.591562.0129
SAIDI (hr/c.yr)1.008600.723520.711900.66594
SAIFI (f/c.yr)1.53541.27971.27021.1240
EENS (MWhr/yr)8.32873.68414.24573.5237
AENS (MWhr/C.yr)0.000668970.000295910.000341020.00028303
ASAI (p.u.)0.999880.999920.999920.99992
CAIDI (hr/c.Int.)0.656910.63660.604270.58151
ASUI (p.u.)0.000115148.2594 × 10−58.1267 × 10−57.6021 × 10−5