Research Article

Operation and Economic Analysis for Ring Road: Baqubah City as Case Study

Table 9

Vehicle operating costs on ring road segments.

ā€‰VOC ($/vehicle-km)Second segmentThird segment
Length (km)VOC ($/vehicle)Length (km)VOC ($/vehicle)

Old route0.17697971.23885310.51.8582795

New route0.08340610.50.87576310.80.9007848

Net VOC reduction0.36309Net VOC reduction0.9574947