Research Article
Operation and Economic Analysis for Ring Road: Baqubah City as Case Study
Table 8
The vehicle operating cost calculation for old and new routes.
| ā | Vehicle type | Fuel consumption cost ($/km) | Tire life cost ($/km) | Oil consumption cost ($/km) | Vehicle maintenance cost ($/km) | Total cost ($/km) | Vehicle (%) | Cost per vehicle-kilometer | Total cost ($/vehicle-km) |
| Old route | PC | 0.0357 | 0.01739 | 0.0305 | 0.012 | 0.09559 | 72 | 0.068825 | 0.176979 | MT | 0.0462 | 0.1739 | 0.02285 | 0.03 | 0.27295 | 12 | 0.032754 | LT | 0.0602 | 0.3478 | 0.03325 | 0.03 | 0.47125 | 16 | 0.0754 |
| New route | PC | 0.02625 | 0.00491 | 0.0215 | 0.006 | 0.05866 | 72 | 0.042235 | 0.083406 | MT | 0.0286 | 0.0491 | 0.01835 | 0.015 | 0.11105 | 12 | 0.013326 | LT | 0.032 | 0.09828 | 0.02875 | 0.015 | 0.17403 | 16 | 0.027845 |
|
|