Operation and Economic Analysis for Ring Road: Baqubah City as Case Study

Table 4

Construction costs details.

SegmentPartCurrent conditionUpgradeLength (km)Cost $/kmAmount ($)

11ExcellentNon10.50.00.0

21ExcellentNon20.00.0
2Very poorMajor8.5900,0007,650,000

31GoodMinor5300,0001,500,000
2Very poorMajor6.11900,0005,500,000
3FairMedium3.3500,0001,650,000

Total16,317,000