Research Article

Operation and Economic Analysis for Ring Road: Baqubah City as Case Study

Table 11

The travel time cost for the third segment.

ā€‰Vehicle typeAverage IRI influence speed (km/h)Length (km)TT (h)People per vehicleTon/vehicleTravel time cost ($/vehicle)Vehicle (%)TTC ($/vehicle)Total TTC($/vehicle)

Old routePC4610.50.228261601.74647761.3273171.530788
MT3710.50.2837841.5270.683805130.088895
LT2810.50.3751.5471.0416110.114576

New routePC10010.80.108600.82633760.628010.725295
MT8010.80.1351.5270.325296130.042288
LT6010.80.181.5470.499968110.054996

Total reduction ($/vehicle)0.805492