Research Article

Operation and Economic Analysis for Ring Road: Baqubah City as Case Study

Table 10

The travel time cost for the second segment.

ā€‰Vehicle typeAverage IRI influence speed (km/h)Length (km)TT (h)People per vehicleTon/vehicleTravel time cost ($/vehicle)Vehicle (%)TTC ($/vehicle)Total TTC($/vehicle)

Old routePC4670.152174601.164313720.8383051.004114
MT3770.1891891.5270.45587120.054704
LT2870.251.5470.6944160.111104

New routePC10010.50.105600.803376720.5784310.694155
MT8010.50.131251.5270.31626120.037951
LT6010.50.1751.5470.48608160.077773

Total reduction ($/vehicle)0.309959