Research Article

Risk Assessment of an Existing Metro Tunnel in Close Proximity to New Shield Tunnels following Construction

Table 1

Four conventional scaling methods.

Comparison1–9 scaling method9/9–9/1 scaling method10/10–18/2 scaling methodIndex scaling method

Same19/9 (1.000)10/10 (1.000)90 (1.000)
Slightly larger39/7 (1.286)12/8 (1.500)91/9 (1.277)
Significantly larger59/5 (1.800)14/6 (2.333)93/9 (2.080)
Strongly larger79/3 (3.000)16/4 (4.000)96/9 (4.237)
Extremely larger99/1 (9.000)18/2 (9.000)99/9 (9.000)