[Retracted] Multiobjective Optimization Management of Construction Engineering Based on Ant Colony Algorithm
Table 3
Summary of cost data of installation process of laminated plate components (yuan).
| Serial number | Process name | Normal mode | Rush mode | Saving mode |
| 1 | Mobilization and inspection of components | 15.5 | 16.5 | 13.9 | 2 | Erection equipment support | 22.4 | 23.5 | 20.7 | 3 | Cleaning of base course and construction surface | 5.2 | 6.1 | 4.3 | 4 | Layout of embedded parts | 12.5 | 14.7 | 10.4 | 5 | Hoisting and transportation of laminated plates | 36.4 | ā | ā | 6 | Installation of laminated plate in place | 17.0 | 18.2. | 15.8 | 7 | Grouting operation | 43.7 | 45.5 | 41.1 | 8 | Node protection | 8.4 | 9.0 | 7.2 | 9 | Site cleaning | 2.4 | 2.7 | 1.9 |
|
|