Research Article

Estimating the Railway Network Capacity Utilization with Mixed Train Routes and Stopping Patterns: A Multiobjective Optimization Approach

Table 3

The instances for case study (IC).

Instance (departure time horizon length, minute)# Candidate trains
Categorized by linesCategorized by stopping patternTotal
Zhengjiao ICZhengji ICZhengkai ICDirect (0 inter. stop)Skip-stop (≥1 inter. stop(s))Stop-by stop

601010121212832
120304038404226108
180536460657537177
2406290869210149238
300691069610311553271