Research Article
Dynamic Risk Assessment and Control Framework for Work Zone and Its First Implementation under Simulation Environment
Table 7
Experiment design and equivalent conflict analysis results.
| Experiment index | Length of the warning area (m) | Speed limit of the warning area (km/h) | Traffic volume (vehicles/h) | Proportion of large vehicle | UTECN of two or multivehicle conflict | UTECN of single-vehicle conflict |
| 1 | 400 | 80 | 2000 | 0.1 | 1 | 3 | 2 | 400 | 70 | 2500 | 0.2 | 21 | 6 | 3 | 400 | 60 | 3000 | 0.3 | 137 | 59 | 4 | 400 | 50 | 3500 | 0.4 | 214 | 128 | 5 | 600 | 80 | 3000 | 0.4 | 180 | 106 | 6 | 600 | 70 | 3500 | 0.3 | 158 | 45 | 7 | 600 | 60 | 2000 | 0.2 | 37 | 1 | 8 | 600 | 50 | 2500 | 0.1 | 21 | 4 | 9 | 800 | 80 | 3500 | 0.2 | 114 | 139 | 10 | 800 | 70 | 3000 | 0.1 | 11 | 6 | 11 | 800 | 60 | 2500 | 0.4 | 35 | 2 | 12 | 800 | 50 | 2000 | 0.3 | 11 | 28 | 13 | 1000 | 80 | 2500 | 0.3 | 25 | 19 | 14 | 1000 | 70 | 2000 | 0.4 | 30 | 25 | 15 | 1000 | 60 | 3500 | 0.1 | 57 | 57 | 16 | 1000 | 50 | 3000 | 0.2 | 70 | 60 | Real scenario | 500 | 80 | 3500 | 0.22 | 170 | 173 |
|
|