Research Article
Minimum Cost Flow-Based Integrated Model for Electric Vehicle and Crew Scheduling
Table 9
Spells and potential shifts of EVCSPM and two-stage sequential models.
| Problem | Model | Item | #tier | #spell | #spell_2 | #spell_3 | #spell_4 | #spell_5 | #spell_6 | #shift |
| T1 | EVCSPM | 19 | 2457 | 357 | 474 | 630 | 768 | 228 | 117979 | TSM | — | 820 | 260 | 241 | 211 | 99 | 9 | 17185 |
| T2 | EVCSPM | 19 | 4698 | 505 | 697 | 928 | 1136 | 1432 | 307850 | TSM | — | 826 | 255 | 237 | 212 | 114 | 8 | 17215 |
| T3 | EVCSPM | 19 | 2813 | 482 | 608 | 771 | 779 | 173 | 171998 | TSM | — | 882 | 261 | 241 | 219 | 128 | 33 | 20028 |
| T4 | EVCSPM | 19 | 2402 | 356 | 460 | 605 | 705 | 276 | 118834 | TSM | — | 885 | 262 | 244 | 222 | 133 | 24 | 20084 |
| T5 | EVCSPM | 20 | 2822 | 361 | 512 | 732 | 962 | 255 | 157576 | TSM | — | 821 | 252 | 234 | 211 | 110 | 14 | 16990 |
| T6 | EVCSPM | 19 | 3078 | 377 | 521 | 750 | 1007 | 423 | 186162 | TSM | — | 841 | 260 | 240 | 211 | 109 | 21 | 17888 |
| T7 | EVCSPM | 4 | 158 | 76 | 70 | 12 | 0 | 0 | 179 | TSM | — | 79 | 43 | 26 | 10 | 0 | 0 | 89 |
| T8 | EVCSPM | 4 | 154 | 75 | 65 | 13 | 1 | 0 | 220 | TSM | — | 82 | 43 | 26 | 12 | 1 | 0 | 94 |
| Avg. | EVCSPM | 15.38 | 2322.75 | 323.63 | 425.88 | 555.13 | 669.75 | 348.38 | 132599.75 | TSM | — | 654.5 | 204.5 | 186.13 | 163.5 | 86.75 | 13.63 | 13696.63 |
|
|