Research Article

Joint Optimal Train Rescheduling and Passenger Flow Control for Speed Limit and High-Demand Scenarios of Urban Rail Transits

Table 3

Results of the two approaches.

MethodNumber of passengers servedCoefficient of boarding equalization rateTotal delay (s)Computing time (s)

Model 2-based approach72 58615%26 80032.763
Two-stage approach{71 880, 72 571, 73 134, 73 701}{10%, 15%, 20%, 25%}26 80010.132