Research Article

Collaborative Strategies and Simulation of Vehicle Group Behaviors for Off-Ramp Areas

Table 1

Actual traffic flow through detection nodes in different simulation conditions (main road total traffic flow and off-ramp traffic flow).

Traffic flow per hour per laneMain road
10001200140016001800

Off-ramp rate20%(2953,575)(3566,691)(4166,806)(4763,927)(5340,1054)
30%(2953,916)(3566,1082)(4166,1245)(4368,1272)(4281,1256)
40%(2953,1236)(3320,1317)(3271,1307)(3248,1304)(3341,1325)