Research Article

Measuring Passenger Car Equivalents (PCE) for Heavy Vehicle on Two Lane Highway Segments Operating Under Various Traffic Conditions

Table 1

PCE factor values.

PCE factor value
Analysis lane TVLOpposite lane TVL lasting time
Opposite lane TVLA5 min15 min30 min60 min90 min120 min

A2.22.22.22.22.22.2
B2.22.22.22.22.22.2
C2.22.22.22.22.22.2
D2.352.602.884.165.436.71
E1.671.361.211.111.081.06

B
A2.22.22.22.22.22.2
B2.22.22.22.22.22.2
C2.533.033.463.895.477.05
D1.891.761.701.671.651.65
E1.371.161.081.041.031.02

C
A2.62.62.62.62.62.6
B3.13.13.13.13.13.1
C2.082.062.052.042.042.04
D1.531.391.351.321.311.31
E1.251.101.051.031.021.01

D
A2.102.092.072.062.563.06
B3.023.784.234.564.694.76
C1.451.341.301.291.281.28
D1.291.191.161.141.141.13
E1.161.061.031.021.011.01

E
A2.262.312.332.342.342.34
B1.661.601.581.571.561.56
C1.261.191.171.161.161.16
D1.201.141.121.111.111.10
E1.101.031.021.011.011.00