Research Article

Optimization of the Shunting Operation Plan at Electric Multiple Units Depots

Table 9

The shunting operation plan of S-EMUs at the stub-end EMU depot generated by the RVNS algorithm.

IndexMaintenanceCleaningStorage
TrackSectionDwell timeTrackSectionDwell timeTrackSectionDwell time

S-EMU-11I35–1155I0–3513II115–672
S-EMU-21II35–1155II5–3513I115–680
S-EMU-34I96–1765I37–969II176–725
S-EMU-44II96–1765II66–969I176–761
S-EMU-51I163–2996I299–32910II329–568
S-EMU-61II219–2996II299–32910I329–741
S-EMU-71I321–4015I255–3218II401–541
S-EMU-81II321–4015II261–3218I401–651
S-EMU-93I310–4567I280–31015I456–790