Research Article
Optimization of the Shunting Operation Plan at Electric Multiple Units Depots
Table 6
The processed schedule including DL-EMUs.
| Index | (min) | (min) | (min) | (min) |
| DL-EMU-1 | 0 | 680 | 5 | 672 | DL-EMU-2 | 37 | 761 | 66 | 725 | DL-EMU-3 | 163 | 741 | 219 | 568 | DL-EMU-4 | 255 | 651 | 261 | 541 | S-EMU-9 | 280 | 790 | — | — | L-EMU-10 | 20 | 755 | — | — | L-EMU-11 | 44 | 666 | — | — | L-EMU-12 | 131 | 701 | — | — | L-EMU-13 | 150 | 710 | — | — | L-EMU-14 | 170 | 614 | — | — | L-EMU-15 | 242 | 579 | — | — | L-EMU-16 | 276 | 780 | — | — | L-EMU-17 | 292 | 619 | — | — |
|
|