Optimization of the Shunting Operation Plan at Electric Multiple Units Depots

Table 5

The shunting operation plan generated by CPLEX at the stub-end EMU depot.

IndexMaintenanceCleaningStorage
TrackSectionDwell timeTrackSectionDwell timeTrackSectionDwell time

S-EMU-12II502–6427I642–67213I0–502
S-EMU-23II524–6805I325–52410I5–325
S-EMU-32I502–7256I302–50212I37–302
S-EMU-43I66–3026II302–42612I426–761
S-EMU-54I163–3256I524–56815II325–524
S-EMU-64II219–3255II325–52415I524–741
S-EMU-74I325–5417I255–28513II285–325
S-EMU-84II325–5415I261–32512II541–651
S-EMU-93I524–7905II280–32515I325–524
L-EMU-101579–755620–801480–579
L-EMU-111104–254544–10411254–666
L-EMU-123325–5245524–70115131–325
L-EMU-134546–7107486–5469150–486
L-EMU-142170–3207554–6148320–554
L-EMU-151426–5796242–30212302–426
L-EMU-161276–4267426–48610486–780
L-EMU-172352–5027292–35213502–619