Research Article

Optimization of the Shunting Operation Plan at Electric Multiple Units Depots

Table 4

The shunting operation plan generated by CPLEX at the through EMU depot.

IndexMaintenanceCleaningStorage
TrackSectionDwell timeTrackSectionDwell timeTrackSectionDwell time

S-EMU-13I568–6727I0–3011I30–568
S-EMU-24I299–4697I469–68010I5–299
S-EMU-32I645–7255I37–13111II131–645
S-EMU-42II680–7617II650–6808I66–650
S-EMU-53II449–5687II163–1939I193–449
S-EMU-63I219–2997I680–7418II299–680
S-EMU-73I449–5416I310–44910II255–310
S-EMU-82I302–4646I261–30215I464–651
S-EMU-94II310–4696II280–31010I469–790
L-EMU-101605–7556449–6051520–449
L-EMU-11444–2995299–40414404–666
L-EMU-123299–4495131–2999449–701
L-EMU-132150–3027302–40412404–710
L-EMU-142464–6145404–46412170–404
L-EMU-151426–5797242–30213302–426
L-EMU-161276–4265720–78013426–720
L-EMU-174469–6197404–46914292–404