Research Article

Optimization of the Shunting Operation Plan at Electric Multiple Units Depots

Table 10

The track utilization rate of each yard generated by original models.

YardThroughStub-end
Track-hoursUtilization rate (%)Track-hoursUtilization rate (%)

Maintenance34.3565.2239.8875.73
Washing23.1758.6519.4049.11
Temporary storage77.7073.7767.4764.05