Optimization of the Shunting Operation Plan at Electric Multiple Units Depots
Table 1
Notations used in the models.
| Notations | Definition |
| Set | | | The set of all EMUs, dummy EMUs not included | | The set of S-EMUs, | | The set of L-EMUs, | | The set of works, dummy works not included | | The set of tracks for Work- |
| Parameters | | | The arrival time of EMU- | | The departure time of EMU- from the depot | | The standard operation time of EMU- for Work- |
| Decision variables | | | The time of EMU- to enter any track for Work- | | The time of EMU- to depart any track for Work- | | The delay of EMU- departing the depot | | Binary variable, = 1 if EMU- performs Work- before Work-, = 0 otherwise | | Binary variable, = 1 if EMU- occupies Track- before EMU-, = 0 otherwise | | Binary variable, = 1 if S-EMU- occupies Section I, = 0 if occupies Section II |
|
|