Research Article

Using Externally Bonded CFRP to Repair a PCCP with Broken Wires under Combined Loads

Table 2

Material parameters.

MaterialDensity (kg/m3)Elastic modulus (MPa)Poisson ratioTensile strength (MPa)

Concrete2500345000.22.64
Steel cylinder78502060000.3215
Prestressing wire78502050000.31570
Mortar2400241650.23.49
CFRP17962400000.3073400
PCCP foundation1890800.29
Soil cushion2200400.35
Backfilling soil1890300.35