Research Article
Harmonic Analysis of Large Grid-Connected PV Systems in Distribution Networks: A Saudi Case Study
Table 2
Load details of the main feeding panels with designed and actual loads.
| No. sub | Transformer no. | Transformer rated capacity | Actual load | S (kVA) | I (A) | S (kVA) | I (A) |
| Panel 1 | T1 | 2000 | 2887 | 418 | 600 | T2 | 2000 | 2887 | 761 | 1100 | T3 | 2000 | 2887 | 418 | 600 | T4 | 2000 | 2887 | 1176 | 1700 | TGU | 1500 | 2165 | 1204 | 1750 | Panel 2 | T1 | 1250 | 1804 | 692 | 1000 | T2 | 1250 | 1804 | 554 | 800 | T3 | 1250 | 1804 | 761 | 1100 | TGD | 1500 | 2165 | 1204 | 1750 | Panel 3 | T1 | 2000 | 2887 | 1176 | 1700 | Panel 4 | T1 | 2000 | 2887 | 692 | 1000 | T2 | 2000 | 2887 | 830 | 1200 | Panel 5 | T1 | 2000 | 2887 | 865 | 1250 |
|
|