Research Article
Fuzzy AHP Based Optimal Design Building-Attached Photovoltaic System for Academic Campus
Table 5
Alternative design for 73.5 kWp BAPV system in E11 Building.
| Alternative | Type of PV | Number of PV | Weight of PV | Price of PV | Covered area | PR | Energy spent to load | Total energy in 25 years | Grid feed-in | LCC | LCOE | Reduction CO2 | PV | Battery | Grid | (unit) | (kg) | $ | m2 | (%) | (%) | (MWh/25 years) | (%) | ($) | ($) | (kg/year) |
| 1 | HIT | 294 | 4410 | $239 | 370.7 | 71.6 | 71.8 | 15.4 | 12.8 | 2,274.28 | 42.3 | $295.806 | $0.130 | 79,551 | 2 | CdTe | 175 | 6300 | $445 | 433.1 | 73.9 | 72.4 | 15.1 | 12.2 | 2,328.51 | 43.7 | $333.223 | $0.141 | 81.963 | 3 | CIS | 420 | 8400 | $162 | 515.8 | 74.3 | 72.7 | 15.1 | 12.2 | 2,368.65 | 44.0 | $359.109 | $0.152 | 82,565 | 4 | Mono | 210 | 3906 | $320 | 342.2 | 76.0 | 74.1 | 14.7 | 11.2 | 2,508.66 | 46.2 | $262.271 | $0.105 | 86,960 | 5 | Poly | 294 | 5586 | $243 | 478.3 | 71.1 | 72.5 | 15.4 | 12.1 | 2,214.63 | 42.5 | $301.372 | $0.136 | 80,547 |
|
|