Research Article
Economic Feasibility for Recycling of Waste Crystalline Silicon Photovoltaic Modules
| Acronym | Variable | Value |
| | Unitary collection cost | 210 €/ton | | Unitary conferred materials cost | 90 €/ton | | Unitary investment cost | 270 €/ton | | Unitary process cost | 320 €/ton | | Unitary taxes cost | 36% | | Rate of inflation | 2% | | Mass/module of conferred material | 128 kg/ton plastics | | Mass/module of recycled material | 175 kg/ton Al; 10 kg/ton Cu; 29 kg/ton Si; 658 kg/ton glass | | Lifetime of investment | 10 y | | Period of loan | 10 y | | Purity level of recycled material | 100% | | Price of recycled material | 1.6 €/kg Al; 4.9 €/kg Cu; 1.4 €/kg Si; 0.1 €/kg glass | | Opportunity cost of capital | 5% | | Interest rate on a loan | 3% | | Size | 2000 tons | | Yield of recycled material | 100% Al; 78% Cu; 85% Si; 97% glass |
|
|
Materials composition in 1 ton of crystalline Si PV modules: 17.5% Al, 65.8% glass, 2.9% Si, 1% Cu, and 12.8% plastics.
|