Research Article

Two-Layer Optimization Method for Sharing Energy Storage and Energy considering Subjectivity

Table 8

Technical and financial parameters of DGS components.

ParameterUnitValue

Wind turbine [54]
 Hub heightm37
 Cut-in wind speedm/s3
 Cut-out wind speedm/s25
 Rated wind speedm/s15
 Extreme wind speedm/s59.5
 Lifetimeyrs20
Photovoltaic panels [24, 55]
 Derating factor [24]0.88
 Lifetimeyrs20
Lithium-ion battery ESS
 Round trip efficiency [56]%90
 Depth of discharge [57]%90
 Lifetime [24]yrs10
 Capital costUS $/kWh330
 O&M costUS $/kWh0.015
Public grid
 The CO2 emission factor of the powerg/kWh800
 Feed-in tariffUS $/kWh0.04
Energy community
 Management feeUS $/kWh0.006
 Transmission cost [58]US $/kWh0.003