Research Article

Protection of Steel Rebar in Salt-Contaminated Cement Mortar Using Epoxy Nanocomposite Coatings

Table 2

Parameters of equivalent circuits for the epoxy/nanoparticles coated rebar in different chloride cement mortars (0.3 and 0.5 wt.%) after 7, 28, and 56 days in 0.1 M NaOH solution.

Time of ponding (days) (Ω) (kΩ) (F) (MΩ) (F) (kΩ) (F)

Coated with epoxy/nano-SiO2, 0.3 wt.% chloride cement mortar

7148.611.65103.1197.9
28197.615.6911.1426.82
56237.916.1139.611.46

Coated with epoxy/nano-SiO2, 0.5 wt.% chloride cement mortar

7268.83.914.254.51
28252.14.294.715.03
56250.46.557.438.16

Coated with epoxy/nano-Fe2O3, 0.3 wt.% chloride cement mortar

730523.2421210.9
28276.330.6153.3164.2
5634453.588.149.7

Coated with epoxy/nano-Fe2O3, 0.5 wt.% chloride cement mortar

7280.111.5611.5611.56
28274.510.9610.9610.96
5639112.9012.9012.90