Research Article

Prediction of Production Performance of Refractured Shale Gas Well considering Coupled Multiscale Gas Flow and Geomechanics

Table 8

Production increase percentage with different SRV widths of refractured new fracture.

SRV width of new fracture (m)Gas flow rate
(104 m3/day)
PIP
(%)
Cumulative gas production
(108 m3)
PIP
(%)

No refracturing2.1511.1373
02.8970.3471.56270.374
62.9140.3551.68940.485
122.9250.3601.76160.549