Research Article

Prediction of Production Performance of Refractured Shale Gas Well considering Coupled Multiscale Gas Flow and Geomechanics

Table 7

Production increase percentage after 7 years corresponding to different SRV lengths of refractured new fracture.

SRV length
(m)
Gas flow rate
(104 m3/day)
PIP
(%)
Cumulative gas production
(108 m3)
PIP
(%)

No refracturing2.1511.1373
502.3388.701.409223.9
1002.92536.01.689448.5
1503.74774.21.949171.4