Research Article

Prediction of Production Performance of Refractured Shale Gas Well considering Coupled Multiscale Gas Flow and Geomechanics

Table 6

Production increase percentage after 7 years based on different fracture conductivities.

Fracture conductivity (D·cm)Gas flow rate
(104 m3/day)
PIP
(%)
Cumulative gas production
(108 m3)
PIP
(%)

No refracturing2.1511.1373
0.0252.56119.11.378521.2
0.052.75928.31.490831.1
0.12.90134.91.606741.3
0.22.92536.01.689448.5