Research Article
Incorporating a Bayesian Network into Two-Stage Stochastic Programming for Blood Bank Location-Inventory Problem in Case of Disasters
Table 27
The FP of the EV solutions of each dataset under varying disaster probabilities.
| The disaster probability change ratio | 1200 | 3600 | 4500_1 | 1200_1 | 1200_2 | 1200_3 | 1200_4 | 1200_5 | 1200_6 | 3600_1 | 3600_2 |
| 0.2 | 83.92% | 84.30% | 84.30% | 83.92% | 83.92% | 83.92% | 83.80% | 83.80% | 83.95% | 0.25 | 84.08% | 84.08% | 84.08% | 84.08% | 84.08% | 84.08% | 84.06% | 84.06% | 84.22% | 0.5 | 83.93% | 83.93% | 83.93% | 83.93% | 83.93% | 83.93% | 83.95% | 83.95% | 83.97% | 1 | 83.98% | 83.98% | 83.98% | 64.80% | 64.80% | 77.43% | 78.61% | 77.39% | 77.45% | 2 | 64.80% | 64.80% | 64.80% | 64.80% | 64.80% | 64.80% | 64.83% | 64.83% | 64.80% | 3 | 64.96% | 64.96% | 64.96% | 64.96% | 64.96% | 64.96% | 64.96% | 64.96% | 64.97% | 4 | 65.30% | 65.30% | 65.30% | 65.30% | 65.30% | 65.30% | 65.31% | 65.31% | 65.31% | 5 | 65.30% | 65.30% | 65.30% | 65.30% | 65.30% | 65.30% | 65.29% | 65.29% | 65.30% |
|
|